Bloom Energy is a named BTM fuel cell OEM winning the datacenter power buildout as US grid headroom turns negative by 2027.
GE Vernova is a named BTM gas turbine OEM with its equipment sold out through 2030, capturing the full price of insatiable datacenter power demand.
BTM datacenter buildout drives structural natural gas demand as the only scalable firm dispatchable fuel for AI infrastructure, with TAM crossing 50GW/yr by 2029.